Mines D’Or Orbec Projects

THIS IS WHAT OPPORTUNITY LOOKS LIKE

A quality team with properties in an area with an exciting future.

Fancamp Property

Summary

▪ Fancamp hosts a two kilometre, 30 to 100 m wide, northeast trending zone comprising several subparallel, <1m to 5 m wide gold mineralized structures and veins, with four target zones (A-, B-, D- and E-zones)
▪ Historic drilling has returned numerous high-grade intercepts; significant values averaging 4 g/t to 20 g/t gold over <1m to 6m;
▪ In 2020, Mines D’Or Orbec drilled 14 holes (totalling 2,808 m) to test down-plunge and along-strike potential of A-, B- and D-zones, as well as channel sampling of nine stripped and cleaned trenches.

Map depicting selected historical drill and trench results

Fancamp 2020 Drilling and Channel Sampling Results

The table below provides a summary of all significant assay results from Mines D’Or Orbec’s 2020 Fancamp drilling campaign:

Table 1: Significant Drill Results (>0.5 g/t Au) – Drill Holes FAN20-01 to 14 (A, B and D-Zones)

Drill Hole

From (m)

To (m)

Drilled Length* (m)

Gold (g/t)

 Target Zone

FAN20-01

115.2

117.4

2.20

0.52

B-Zone

including

115.2

115.7

0.50

1.02

 

 

127.0

127.62

0.62

0.56

 

FAN20-02

33.5

38.85

5.35

1.15

B-Zone

including

34.0

35.0

1.00

4.73

 

FAN20-03

97.1

98.1

1.00

0.62

B-Zone

FAN20-04

64.0

65.85

1.85

1.24

B-Zone

 

78.7

79.3

0.60

1.56

 

FAN20-05

119.6

120.1

0.50

0.91

B-Zone

 

123.5

126.9

3.40

0.80

 

including

126.0

126.9

0.90

1.69

 

 

216.2

216.7

0.50

1.05

 

FAN20-06

     

No significant Results

A/B Zones

FAN20-07

62.7

63.3

0.60

0.98

A-Zone

FAN20-08

39.0

43.7

4.70

0.72

A-Zone

including

43.0

43.7

0.70

1.92

 

FAN20-09

     

No significant Results

A Zone

FAN20-10

69.9

74.6

4.70

0.84

A-Zone

including

69.90

70.70

0.80

2.80

 

 

79.0

80.0

1.00

0.68

 
 

81.80

84.90

3.10

0.63

 

FAN20-11

48.0

48.5

0.50

0.99

B-Zone

FAN20-12

91.25

92.1

0.85

6.91

D-Zone

 

115.3

118.0

2.70

1.52

 

including

116.5

118.0

1.50

2.35

 

FAN20-13

     

No significant Results

D-Zone

FAN20-14

89.9

91.6

1.70

0.53

D-Zone

*True widths are estimated to be approximately 70% to 80% of the drilled length.

Map Depicting Trenches, Drill Holes, Vein Trends – Fancamp A-, B-, and D-zones

2020 Channel Sampling Results from Fancamp A, B and D-Zones

A-Zone

B-Zone

D-Zone

Mines D’Or Orbec Inc.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.